Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20CE0049

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20CE0049","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BALIWAG RIVER, BRGY. MAPANGPANG, LUPAO, NUEVA ECIJA","Flood Control and Drainage","Completed",14319691.49,0,100,"Nueva Ecija 1st DEO","Region III","D.S. PAMINTUAN CONSTRUCTION (31868)","2020-02-18","2020-08-18",2020,"Regular Infra - GAA 2020 OO-2",15.80244,120.89258,"304916000","304900000"]
SHA-256
a458caa42483f1569d7cf72032be165fc48a0f1490159667a7ab0d9b327d699d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.