Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20CF0108

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20CF0108","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, BRGY. BAGONG SIKAT AND BRGY. SAN CARLOS, CABIAO, NUEVA ECIJA","Flood Control and Drainage","Completed",48508757.84,0,100,"Nueva Ecija 2nd DEO","Region III","R.D. TALENS CONSTRUCTION AND TRADING (36817)","2020-12-02","2021-03-15",2020,"Regular Infra - GAA 2020 LP",15.25155,120.83063,"304904000","304900000"]
SHA-256
b56806a3e3976e43184e249af869b2bcc14d360361eb89bc408a194e0f02c185

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.