Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20CF0110

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20CF0110","CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PEÑARANDA RIVER FLOOD CONTROL, BRGY. RIO CHICO, GEN. TINIO, NUEVA ECIJA","Flood Control and Drainage","Completed",9701947.28,0,100,"Nueva Ecija 2nd DEO","Region III","MKM BUILDERS (43343)","2020-09-21","2020-12-25",2020,"Regular Infra - GAA 2020 LP",15.36,121.06903,"304910000","304900000"]
SHA-256
f3bd7f0861b1f312d5f8845b3508d29ea92cb99c1b10a47200cde62e5094344c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.