Project 20CJ0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20CJ0021","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN JOSE - SANTIAGO SECTION (PHASE III), GERONA, TARLAC","Flood Control and Drainage","Completed",47144818.77,0,100,"Tarlac DEO","Region III","R.R. RICAFORT CONSTRUCTION AND SUPPLIES (14402)","2020-02-20","2020-08-18",2020,"Regular Infra - GAA 2020 OO-2",15.5569,120.57733,"306916000","306900000"]