Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20CM0027

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20CM0027","FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, REHABILITATION OF PAMATAWAN RIVER (CABALLUCAN SECTION), CASTILLEJOS, ZAMBALES","Flood Control and Drainage","Completed",47685917.31,0,100,"Zambales 2nd DEO","Region III","R.D. SADSAD CONSTRUCTION & TRADING (19240)","2020-02-14","2020-09-10",2020,"Regular Infra - GAA 2020 OO-2",14.93784,120.20816,"307104000","307100000"]
SHA-256
5c8c39178fae3e64385f39ea683ba1a1765fb1d6187e96514af0a1591f30ad1b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.