Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20CM0030

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20CM0030","FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, REHABILITATION OF TAMAYOK RIVER SUBIC, ZAMBALES","Flood Control and Drainage","Completed",47535625.25,0,100,"Zambales 2nd DEO","Region III","THREE W BUILDERS, INC. (10722)","2020-02-14","2020-11-09",2020,"Regular Infra - GAA 2020 OO-2",14.88856,120.23915,"307114000","307100000"]
SHA-256
09a208452ace4219f16c52f4fb4c7ebaedd50c475e6bea20bfaebb2a28f273d8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.