Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20DE0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20DE0022","ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, BATANGAS-LOBO RD - K0131+360 - K0131+380","Roads","Completed",5194000,0,100,"Batangas 2nd DEO","Region IV-A","JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)","2020-12-01","2021-02-24",2020,"Regular Infra - GAA 2020 OO-1",13.69461,121.21575,"401015000","401000000"]
SHA-256
bc4d6ef5cc395b44b2b2bf27ce98d32c7361f69a64522c569c8719ab61b56314

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.