Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20DH0058

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20DH0058","CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, LUMBAN SECTION, LUMBAN, LAGUNA","Flood Control and Drainage","Completed",23845908.93,0,100,"Laguna 1st DEO","Region IV-A","JOBEL ENTERPRISES (19799)","2020-05-27","2020-12-27",2020,"Regular Infra - GAA 2020 LP",14.29013,121.4599,"403413000","403400000"]
SHA-256
21d83c656abe541740b4d2fba17a12039a78e5ec3886b834d20f5bb7ad51fda1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.