Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20DK0004

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20DK0004","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG AGOS RIVER, GENERAL NAKAR, QUEZON","Flood Control and Drainage","Completed",57900000,0,100,"Quezon 1st DEO","Region IV-A","R.T.Y.  CONSTRUCTION (10341)","2020-02-21","2020-12-11",2020,"Regular Infra - GAA 2020 OO-2",14.75309,121.62292,"405617000","405600000"]
SHA-256
928dd33c176fdfb2f4defd9716a0116503ffd6e6981226938c92ba5c76ac097e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.