Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20DN0035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20DN0035","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MUNTINDILAW RIVER (DOWNSTREAM) ANTIPOLO CITY, RIZAL","Flood Control and Drainage","Completed",92151803.67,0,97.58,"Rizal 1st DEO","Region IV-A","A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL (22265)","2020-03-04","2021-03-27",2020,"Regular Infra - GAA 2020 OO-2",14.61511,121.11658,"405805000","405800000"]
SHA-256
4c495d26ce24a7f796e83e1996c3750e35302a1aecee16871dfe8a68e77f0551

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.