Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20DN0037

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20DN0037","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MUNTINDILAW RIVER (DOWNSTREAM), PHASE 3, ANTIPOLO CITY, RIZAL","Flood Control and Drainage","Completed",64691377.26,0,100,"Rizal 1st DEO","Region IV-A","A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL (22265)","2020-03-04","2020-12-28",2020,"Regular Infra - GAA 2020 OO-2",14.61511,121.11658,"405805000","405800000"]
SHA-256
e54cd5feeae778c68f8986c01c65b69f4d5ee01d46e18116442b42c48cc14f92

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.