Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20DN0063

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20DN0063","IMPROVEMENT / CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF CAINTA RIVER, BRGY. SAN JUAN CAINTA, RIZAL","Flood Control and Drainage","Completed",29512156.34,0,100,"Rizal 1st DEO","Region IV-A","C.F. TRINIDAD CONSTRUCTION AND SUPPLIES CORP. (FOR (9199)","2020-12-07","2021-07-04",2020,"Regular Infra - GAA 2020 OO-2",14.57158,121.12289,"405805000","405800000"]
SHA-256
1b298c2368d60256fe19de6db107628a2b6c13f472d9af443006b5b5705ef17a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.