Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20DQ0013

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20DQ0013","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG BACOOR RIVER, PHASE I, BRGY. DAANG BUK","Flood Control and Drainage","Completed",57899948.39,0,100,"Cavite 3rd DEO","Region IV-A","GRAIA CONSTRUCTION CORPORATION (30826)","2020-02-26","2021-01-05",2020,"Regular Infra - GAA 2020 OO-2",14.45725,120.9413,"402103000","402100000"]
SHA-256
688d3ed9f8122d85a98997ed97df5822f32d0255c19c21e512aa4cf233741871

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.