Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20DQ0027

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20DQ0027","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG BALUCTOT RIVER, PHASE IV, BRGY.","Flood Control and Drainage","Completed",77199819.72,0,100,"Cavite 3rd DEO","Region IV-A","L.R. TIQUI BUILDERS, INC. (13810)","2020-09-16","2021-06-07",2020,"Regular Infra - GAA 2020 OO-2",14.29076,120.98026,"402106000","402100000"]
SHA-256
d491398175c8c6570efb42420462d6afa4889de332e4ca1f6533d9664781dbbc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.