Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20ED0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20ED0051","CONSTRUCTION OF FLOOD CONTROL/DRAINAGE SYSTEM, MULAWIN - ARANGIN ARMOURING, NAUJAN, ORIENTAL MINDORO","GAA 2020 OO-2","Completed",29795256.97,0,100,"Mindoro Oriental DEO","MIMAROPA Region","NORTHERN BUILDERS (8789)","2020-11-30","2021-06-23",2020,"Regular Infra - GAA 2020 OO-2",13.23339,121.13077,"1705208000","1705200000"]
SHA-256
7adcf72fbfb9254a1288767e96f4dcec00e038124013a97dcf06a12952e0e14c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.