Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20EF0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20EF0040","CONSTRUCTION OF INOGBONG FLOOD CONTROL STRUCTURE, BATARAZA, PALAWAN","GAA 2020 OO-2","Completed",43111732.38,0,100,"Palawan 2nd DEO","MIMAROPA Region","L. B. LEONCIO TRADING AND CONSTRUCTION CORPORATION (FORMERLY: L.B. LEONCIO TRADING & CONSTRUCTION) (31587)","2020-02-13","2020-09-30",2020,"Regular Infra - GAA 2020 OO-2",8.6842,117.6438,"1705305000","1705300000"]
SHA-256
f9d091d6b83591ee71642b5480bceb1aadc4c2e9f6a73fc1d5ee2bec899981e1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.