Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20EI0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20EI0041","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE MANSALAY RIVER, BRGY. POBLACION, MANSALAY, ORIENTAL MINDORO","GAA 2020 OO-2","Completed",29399983,0,100,"Southern Mindoro DEO","MIMAROPA Region","LUMEL GLENN CONSTRUCTION (26817)","2020-02-20","2020-12-15",2020,"Regular Infra - GAA 2020 OO-2",12.51876,121.43852,"1705207000","1705200000"]
SHA-256
014828167d9154d8a5fa9f704e54d5db5563504d722ee1aa67fe4b06ec71f683

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.