Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20FA0080

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20FA0080","CLUSTER 51-CONSTRUCTION OF SEAWALL AND FLOOD MITIGATION AT TIWI AND BACACAY, ALBAY","GAA 2020 OO-2","Completed",57067420,0,100,"Albay 1st DEO","Region V","DSB CONSTRUCTION  & SUPPLY, INC. (FORMERLY: DSB CO (16126)","2020-12-29","2021-06-28",2020,"Regular Infra - GAA 2020 LP, Regular Infra - GAA 2020 OO-2",13.46582,123.68286,"500518000","500500000"]
SHA-256
8dd90adac3d327cd9c554d0bd64958ac3323e24cf3a72ac6598f8be73b85dfec

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.