Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20FC0077

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20FC0077","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SAN NICOLAS RIVER CONTROL, BRGY. CABANBANAN, SAN VICENTE, CAMARINES NORTE","Flood Control and Drainage","Completed",35005235.23,0,100,"Camarines Norte DEO","Region V","EUS CONSTRUCTION (21878)","2020-06-08","2020-12-21",2020,"Regular Infra - GAA 2020 OO-2",14.10944,122.87495,"501609000","501600000"]
SHA-256
7b11ed1ab70643b470961f95b7123c0d998174c93dd2142d3b1b36610b3adb22

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.