Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20FG0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20FG0033","CONSTRUCTION OF FLOOD CONTROL STRUCTURES,I-BRGY. TAWOG (POBL) CARAMOAN STA.0+000.00 - STA.0+009.00II-BRGY. SAN ANTONIO, SAGÑAY STA.0+000.00 - STA.0+021.00BRGY. TAWOG (POBL.), CARAMOAN AND BRGY. SAN ANTONIO, SAGÑAY, CAM. SUR","Flood Control and Drainage","Completed",1878756.69,0,100,"Camarines Sur 4th DEO","Region V","LIMCORE CONSTRUCTION AND SUPPLY (40712)","2020-02-23","2020-07-13",2020,"Regular Infra - GAA 2020 LP",13.60169,123.52048,"501731000","501700000"]
SHA-256
2ab6537d6cf0430bbd93f8059fbba24caa351e3358dbab8a458137e6d479a122

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.