Project 20FI0030
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-20FI0030",
"title": "FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG LUMBANG RIVER, STA. 3+377 - STA. 3+758 (UPSTREAM, LEFT SIDE AND RIGHT SIDE), NET LENGTH = 762.00 L.M., MASB",
"sector": [
"Flood Control and Drainage"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Masbate 2nd DEO"
},
"period": {
"startDate": "2020-03-12",
"endDate": "2021-03-15"
},
"budget": {
"amount": {
"amount": 48607213.75,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
123.57319,
12.33105
]
}
}
],
"parties": [
{
"name": "SPRING STAR CONSTRUCTION AND SUPPLY",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "20FI0030",
"summary": {
"title": "FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG LUMBANG RIVER, STA. 3+377 - STA. 3+758 (UPSTREAM, LEFT SIDE AND RIGHT SIDE), NET LENGTH = 762.00 L.M., MASB",
"status": "closed",
"contractValue": {
"amount": 48607213.75,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - GAA 2020 OO-2",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "d2d0a5748b6f6589b5c2894c014b7be792d6ded61afe83356ccb6455ad394329"
}
}