Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20FK0011

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20FK0011","ONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE STYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG INCARIZAN RIVER CONTROL MAGALLANES, SORSOGON","Flood Control and Drainage","Completed",37430442.67,0,100,"Sorsogon DEO","Region V","SPRING STAR CONSTRUCTION AND SUPPLY (20240)","2020-12-01","2021-09-15",2020,"Regular Infra - GAA 2020 OO-2",12.8403,123.88502,"506211000","506200000"]
SHA-256
960437bf01dd614ff9c0fcfbc62a37a5ff7a5b35ef57ccd04f6533356a337c4e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.