Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20FN0079

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20FN0079","LOCAL INFRASTRUCTURE PROGRAM FLOOD CONTROL AND DRAINAGE DRAINAGE/ PROTECTION WORKS REHABILITATION/IMPROVEMENT OF BICOL RIVER BASIN FLOOD CONTROL STRUCTURE LA PURISIMA SECTION NABUA, CAMARINES SUR STA 2+200.00  STA. 2+275.00","Flood Control and Drainage","Completed",9844886.08,0,100,"Camarines Sur 5th DEO","Region V","RICHMAR CONSTRUCTION (18797)","2020-09-21","2021-05-26",2020,"Regular Infra - GAA 2020 LP",13.41838,123.32367,"501723000","501700000"]
SHA-256
4f99c37bbb29512573af38f4f43a00014617b392e3fcdad8a0a513d2c43faab9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.