Project 20GD0011

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20GD0011","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL/FLOOD CONTROL ALONG PANAY RIVER PHASE I, PANAY, CAPIZ","Flood Control and Drainage","Completed",28767806.84,0,100,"Capiz 1st DEO","Region VI","MBM CONSTRUCTION (37891)","2020-02-13","2020-08-18",2020,"Regular Infra - GAA 2020 OO-2",11.48714,122.82459,"601912000","601900000"]