Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20GD0059

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20GD0059","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - RECONSTRUCTION OF TICO RIVER CONTROL (DOWNSTREAM), PANAY, CAPIZ","Flood Control and Drainage","Completed",63631000.78,0,100,"Capiz 1st DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2020-11-25","2022-02-14",2020,"Regular Infra - GAA 2020 OO-2",11.49669,122.82014,"601909000","601900000"]
SHA-256
bb714c7e16bce76fe58ff1c10099c921c82f36c33e098b5c5ec96f59a25ba88e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.