Hashed input (canonical JSON of the source row)
["dpwh","20GF0022","CONSTRUCTION OF CAMANGAHAN RIVER CONTROL ALONG JARAO RIVER, GUIMBAL, ILOILO","Flood Control and Drainage","Completed",27929900.3,0,100,"Iloilo 1st DEO","Region VI","GOLDEN ROADRUNNER INTERNATIONAL CORP. (10177)","2020-02-10","2021-03-02",2020,"Regular Infra - GAA 2020 OO-2",10.71716,122.31189,"603020000","603000000"]
SHA-256
038402d0482196d4edb0ee5d1159721d933b662194c28130e8c025ddeee42147