Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20GF0026

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20GF0026","CONSTRUCTION OF PARTICION RIVER CONTROL, GUIMBAL, ILOILO","Flood Control and Drainage","Completed",27950471.39,0,100,"Iloilo 1st DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2020-03-10","2021-05-04",2020,"Regular Infra - GAA 2020 OO-2",10.68058,122.30365,"603020000","603000000"]
SHA-256
b8412c467fc87c20649e38b208f3377f1bb3161bceb80fbed757b2a5d9396998

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.