Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20GG0038

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20GG0038","CONSTRUCTION OF SUAGE RIVER CONTROL SYSTEM, JANIUAY, ILOILO","Flood Control and Drainage","Completed",32585000,0,100,"Iloilo 2nd DEO","Region VI","ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION) (8546)","2020-12-03","2021-06-29",2020,"Regular Infra - GAA 2020 OO-2",10.95235,122.50442,"603023000","603000000"]
SHA-256
ddc556f97f612e5ff5b3df9417035198f455bf6d6155bf797a0225d39b6bfb3c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.