Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20GI0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20GI0015","CONSTRUCTION OF SIBALOM FLOOD CONTROL PROJECT (SIBALOM RIVER), BRGY.LANAG, LEON, ILOILO","Flood Control and Drainage","Completed",55493227.94,0,100,"Iloilo 4th DEO","Region VI","IBC INTERNATIONAL BUILDERS CORPORATION (8576)","2020-02-26","2020-10-21",2020,"Regular Infra - GAA 2020 OO-2",10.78862,122.39525,"603028000","603000000"]
SHA-256
22ec446d158b966c4b2ad8ae87f5c98774438eb875973ada607d2a21ffd60547

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.