Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20GK0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20GK0033","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGACAY RIVER, SILAY  CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",23271985.53,0,100,"Negros Occidental 1st DEO","Negros Island Region","SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)","2020-03-23","2020-10-22",2020,"Regular Infra - GAA 2020 OO-2",10.75891,122.99919,"1804526000","1804500000"]
SHA-256
315a4edacec3107defc2c607d801a9640bb8b16dc8506099a8c5e48295d1bbe4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.