Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20GO0007

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20GO0007","CONSTRUCTION OF REVETMENT WITH FLOODWALL ALONG LUPIT RIVER, PHASE 4, BACOLOD CITY","Flood Control and Drainage","Completed",26979758.59,0,100,"Bacolod City DEO","Negros Island Region","A.C. RIVERO DEVELOPMENT CORPORATION (5122)","2020-11-25","2021-03-22",2020,"Regular Infra - GAA 2020 OO-2",10.66071,122.95615,"1830200000","1804500000"]
SHA-256
96c37fbe41916393651123f1eecfd852e0ee3c6abfdead570585239a78df74e9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.