Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20GO0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20GO0008","CONSTRUCTION OF REVETMENT WITH FLOODWALL IN MAGSUNGAY RIVER, PHASE 4, BACOLOD CITY","Flood Control and Drainage","Completed",32144000,0,100,"Bacolod City DEO","Negros Island Region","SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)","2020-11-25","2021-03-19",2020,"Regular Infra - GAA 2020 OO-2",10.64865,122.93754,"1830200000","1804500000"]
SHA-256
b59aa4366184b91f024fa4896d65a71f504bce30b9993a183a7498bf69dc0144

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.