Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20GO0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20GO0010","CONSTRUCTION OF REVETMENT WITH FLOODWALL IN SOLUM CREEK,BACOLOD CITY","Flood Control and Drainage","Completed",18621122.19,0,100,"Bacolod City DEO","Negros Island Region","ALTA NEGROS INDUSTRIAL SUPPLY CORPORATION (33806)","2020-11-25","2021-06-28",2020,"Regular Infra - GAA 2020 OO-2",10.67956,122.97511,"1830200000","1804500000"]
SHA-256
79d9ba905e05122c211c3bcfd4daed4b7fc15df1b33a8a0518dbaff0b0861f3e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.