Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20HB0006

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20HB0006","CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO INTERNATIONAL PILGRIMAGE SHRINE SA BIRHEN SA BARANGAY, JAGNA, BOHOL STA.0+000 -STA.0+281.63","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP","Completed",8378999.5,0,100,"Bohol 3rd DEO","Region VII","J.F. ESTAPIA CONSTRUCTION (40112)","2020-02-25","2020-07-03",2020,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP",9.65309,124.37277,"701225000","701200000"]
SHA-256
ae842682f517b1369a84d6ed5c5f2891eedd4f1d229f206cdb291c230e3dddef

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.