Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20HB0059

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20HB0059","ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, JCT.(LIR) CARMEN-SAGBAYAN-BACANI RD. KO163+","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP","Completed",16460415.67,0,100,"Bohol 3rd DEO","Region VII","YS CONSTRUCTION (11928)","2020-02-26","2020-07-10",2020,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP",9.83675,124.1763,"701212000","701200000"]
SHA-256
1e16fd5cb67cf642ee3ae19b5a1d7f10279c4d00a99fcb62c310330d24b9c4b8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.