Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20HN0044

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20HN0044","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATIONSTRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PITOGO RIVER (PHASE II), CONSOLACION, CEBU","Flood Control and Drainage","Completed",27923508.63,0,100,"Cebu 6th DEO","Region VII","P.B. OBIAL CONSTRUCTION (16784)","2020-02-27","2020-10-15",2020,"Regular Infra - GAA 2020 OO-2",10.37957,123.96363,"702219000","702200000"]
SHA-256
c94b69a22f74be945b7402f7b3e169c7cf764f9d12fa070b9ba66ce35e060a1c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.