Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20I00005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20I00005","CLUSTER I: 1. CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE B), SITIO BAGANG, BRGY. CABACUNGAN, DULAG, LEYTE; 2. CONSTRUCTION (EXTENSION) OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE B), BRGY. FATIMA, DULAG, LEYTE","Flood Control: Construction - Channel Excavation, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",155934542.21,0,100,"Region VIII","Region VIII","EZJONES CONSTRUCTION INC. (34462)","2020-12-01","2021-04-25",2020,"Regular Infra - Flood Control: Construction - Channel Excavation, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",10.93801,125.0099,"803718000","803700000"]
SHA-256
696641ba015d040813843b0ec97982e4fd4f03c0a4041d07e3b4d8732550706a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.