Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20IA0007

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20IA0007","REHABILITATION OF SANTOL FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, (PHASE 4) BILIRAN, BILIRAN  (124.47218, 11. 48019 -  124.47273, 11.48095)","Flood Control and Drainage","Completed",27905200,0,100,"Biliran DEO","Region VIII","ROVING PREMIER CONTRACTORS, INC. (42347)","2020-02-17","2020-07-25",2020,"Regular Infra - GAA 2020 OO-2",11.45675,124.45398,"807802000","807800000"]
SHA-256
8253d7303f6d80e8dd7dbc71d88e2f040830e80b3104a762f74b2fdcc782ebe5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.