Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20IB0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20IB0018","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ORAS RIVER, BRGY. BALOCAWE, ORAS, EASTERN SAMAR","Flood Control and Drainage","Completed",9799826.76,0,100,"Eastern Samar DEO","Region VIII","TUBIGAN BUILDERS (33185)","2020-02-18","2020-06-05",2020,"Regular Infra - GAA 2020 OO-2",12.13771,125.44604,"802617000","802600000"]
SHA-256
c2fc2bf2487068ce37a97263822ece4b88df8df376fc2695f6fce1a9cbc6f9c2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.