Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20ID0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20ID0022","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALIRE RIVER BASIN, MACARTHUR, LEYTE","Flood Control and Drainage","Completed",39160625.67,0,100,"Leyte 2nd DEO","Region VIII","LANOY CONSTRUCTION (35289)","2020-02-17","2020-09-04",2020,"Regular Infra - GAA 2020 OO-2",10.83336,124.96809,"803730000","803700000"]
SHA-256
ef91086c793ab820046dfdf1d6e4753897701fa41252dd717fc50fbb4b9ecbdc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.