Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20II0027

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20II0027","CONSTRUCTION OF GAMAY FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, GAMAY RIVER BASIN, GAMAY, NORTHERN SAMAR","Flood Control and Drainage","Completed",35419500,0,100,"Northern Samar 2nd DEO","Region VIII","CDU CONSTRUCTION (13915)","2020-02-19","2020-09-30",2020,"Regular Infra - GAA 2020 OO-2",12.38499,125.29495,"804807000","804800000"]
SHA-256
d23c808d32214ef16b4318721eade763f3e63ee96b3fb96bcdf42ccb17f610a2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.