Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20IK0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20IK0041","ACCESS ROAD FROM BRGY. POLANGI - BRGY. PANAYURAN - BRGY. LITEON LEADING TO LULUGAYAN FALLS, CALBIGA RIVER AND LANGUN - GOBINGOB CAVES, STA. 0+775 - STA. 1+375, CALBIGA, SAMAR","Roads","On-Going",14427529.48,0,100,"Samar 2nd DEO","Region VIII","BCG DESIGN AND CONSTRUCTION (43067)","2020-02-03",null,2020,"Regular Infra - GAA 2020 CSSP",11.63085,125.03687,"806004000","806000000"]
SHA-256
bbe6b21aadfcb0149d31ce6a22e217b61fd95b9216323257d8de69f64ef41fbb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.