Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20IK0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20IK0042","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, JIABONG, SAMAR","Flood Control and Drainage","Completed",29317350.49,0,100,"Samar 2nd DEO","Region VIII","SAMARINAN CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: SAMARINAN CONSTRUCTION) (18303)","2020-02-03","2020-11-09",2020,"Regular Infra - GAA 2020 OO-2",11.75944,124.955,"806009000","806000000"]
SHA-256
41eace736bcd5c8b244eebe76d940431d6e1952cbd6188556eacb55734cfbb03

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.