Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20JB0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20JB0015","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DOHINOB RIVER, SAN ANTONIO, MANUKAN, ZAMBOANGA DEL NORTE","Flood Control and Drainage","Completed",33269454,0,100,"Zamboanga del Norte 2nd DEO","Region IX","MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION (19473)","2020-11-27","2021-08-02",2020,"Regular Infra - GAA 2020 OO-2",8.52363,123.18434,"907211000","907200000"]
SHA-256
3c86e375df1a7f0a0b466ad088c9082a7ef699c8dbdb18e005d8584b7893f6c3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.