Hashed input (canonical JSON of the source row)
["dpwh","20JC0014","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - RIVER CONTROL ALONG THE CAMP OFELIA EASEMENT AND MALAYAL SIDE ALONG THE CONCRETE ABUTMENT OF BRIDGE, MALAYAL, SIBUCO, ZAMBOANGA DEL NORTE","Flood Control and Drainage","Completed",39200000,0,100,"Zamboanga del Norte 3rd DEO","Region IX","MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION (19473)","2020-02-27","2020-10-23",2020,"Regular Infra - GAA 2020 OO-2",7.21151,121.94577,"907216000","907200000"]
SHA-256
04c48c63a04a41457b90313e2538bd315c002a33550b8e2459d781e25faad032

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.