Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20JC0038

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20JC0038","CONSTRUCTION OF MULTI-PURPOSE BUILDING, MOROB, LEON B. POSTIGO, ZAMBOANGA DEL NORTE","Buildings and Facilities","Completed",3798985.8,0,100,"Zamboanga del Norte 3rd DEO","Region IX","CPAN ENGINEERING & ENTERPRISES (36702)","2020-02-27","2020-08-29",2020,"Regular Infra - GAA 2020 LP",8.07964,122.88702,"907226000","907200000"]
SHA-256
bc968b9f1a78de1eac5baaeeefcf077210353e88a1ce3426e1362a4b0dfae5f9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.