Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20JD0011

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20JD0011","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIONUM BRIDGE UPSTREAM (PIÑAN-MUTIA ROAD) DIPOLOG RIVER, PIÑAN, ZN","Flood Control and Drainage","Completed",23761543.7,0,100,"Zamboanga del Norte 1st DEO","Region IX","MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION (19473)","2020-02-21","2020-08-03",2020,"Regular Infra - GAA 2020 OO-2",8.45549,123.46236,"907209000","907200000"]
SHA-256
37f0aa428ee598ab4d0f3f176338036bceb70e974860e31617bd9405a997502a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.