Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20JF0019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20JF0019","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUPILAC RIVER (PHASE II), R.T. LIM, ZAMBOANGA SIBUGAY","Flood Control and Drainage","Completed",28148288.26,0,100,"Zamboanga Sibugay 2nd DEO","Region IX","LAKEWOOD CONSTRUCTION COMPANY (5294)","2020-03-20","2021-02-10",2020,"Regular Infra - GAA 2020 OO-2",7.64018,122.46141,"908312000","908300000"]
SHA-256
8727557647017b2b5797eadb189269cf484e53e11ef6e09400aaae7f769b20e8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.