Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20JI0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20JI0051","CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) ALONG SIBUGUEY RIVER (UPSTREAM), 0+000-0+192, BARANGAY CONCEPCION, ALICIA, ZAMBOANGA SIBUGAY","Flood Control and Drainage","Completed",16659861.3,0,100,"Zamboanga Sibugay 1st DEO","Region IX","LAKEWOOD CONSTRUCTION COMPANY (5294)","2020-11-24","2021-04-28",2020,"Regular Infra - GAA 2020 OO-2",7.56356,122.90768,"908301000","908300000"]
SHA-256
6e617d54884677e4f678d6724e723134fd89dab8225bf9258ab22eb2b10e8cbe

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.