Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20KC0092

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20KC0092","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER PACKAGE 3, KALILANGAN, BUKIDNON","Flood Control and Drainage","Completed",9900000,0,100,"Bukidnon 3rd DEO","Region X","JEJOR'S CONSTRUCTION CORPORATION (5143)","2020-09-22","2021-03-14",2020,"Regular Infra - GAA 2020 LP",7.77288,124.75034,"1001307000","1001300000"]
SHA-256
a2491b80390751380383133d628526bf3a796bedf00b96b3eac9cdf3b5080da6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.